Skip to main content

Dundee Gasworks locomotive,Tal-y-llyn

Disgrifiadau

Caption by 'EUROS': Dundee Gasworks No.2 1 ft 11 1⁄2 in (597 mm) Kerr Stuart 0-4-0WT 1907 720 Built for the Dundee gasworks railway. Acquired by the Narrow Gauge Railway Museum, Tywyn in 1961. Major restoration work was carried out in 2004. (see comments box).
Talyllyn Railway was opened in 1866 on a two foot three inch gauge and it was steam operated from the beginning. The railway runs seven and a quarter miles between Tywyn and Nant Gwernol, near Abergynolwyn, from where a series of horse-worked tramways served Bryn Eglwys slate quarries.
When the quarry closed in 1947 a skeleton service was maintained and in 1950 the world's first railway preservation society (the Talyllyn Railway Preservation Society) was formed with the intention of restoring the line to working order. The railway is currently fully operational for tourist use.

Owner:
RCAHMW
Crëwr:
RCAHMW
Gwybodaeth drwydded
Eitem wedi’i llwytho:
28/10/2011
Gwelediadau:
2173
Ffefrynnau:
0

More items with these tags

Cysylltwch â Ni

I wneud cais i dynnu i lawr neu riportio cynnwys hiliol, sarhaus neu niweidiol mewn unrhyw ffordd arall.

Man writing a letter

Sylwadau (3)

Dundee Gasworks No.2 1 ft 11 1⁄2 in (597 mm) Kerr Stuart 0-4-0WT 1907 720 Built for the Dundee gasworks railway. Acquired by the Narrow Gauge Railway Museum, Tywyn in 1961. Major restoration work was carried out in 2004

You must be logged in to leave a comment