Skip to main content

Cefn Croes Wind Farm

Cefn Coed is a wind farm comprising 39 1.5 megawatt turbines, completed in October 2004 at the cost of £50m. The generating capacity of the wind farm is 58 megawatts and at the time of completion, Cefn Croes was the most powerful onshore windfarm in Wales. These photos were taken during construction in 2004.

Gwelediadau:
1552
Ffefrynnau:
0
Casgliad wedi’i greu:
08/12/2014

Cysylltwch â Ni

I wneud cais i dynnu i lawr neu riportio cynnwys hiliol, sarhaus neu niweidiol mewn unrhyw ffordd arall.

Man writing a letter

You must be logged in to leave a comment