Skip to main content

Cynhyrchu alwminiwm yn Rheola Works, Glyn-nedd

Disgrifiadau

Cynhyrchu alwminiwm yn y ffatri yn ystod wythnos olaf o gynhyrchu cyn i'r gwaith gau yn 1981.

Owner:
Roy Bowen
Crëwr:
W E Bowen
Gwybodaeth drwydded
Eitem wedi’i llwytho:
22/4/2020
Gwelediadau:
369
Ffefrynnau:
0

Cysylltwch â Ni

I wneud cais i dynnu i lawr neu riportio cynnwys hiliol, sarhaus neu niweidiol mewn unrhyw ffordd arall.

Man writing a letter

Sylwadau (1)

This picture shows two machined aluminium starter blocks ( or dummies) in place ready for the start of a DC cast. The dummy is entered into the picture frame mould by about 3/4-1" at the start of the cast and provides the initial chill for the solidification of the molten metal feed from the launder. After about 30 seconds of mould filling the starter block descends supported on a hydraulic ram at a speed of 2-4" per minute depending upon the alloy being cast. The picture frame mould is about 5" deep so after 2-3 minutes the cast aluminium slab emerges into the secondary water sprays and steam & hissing are heard. Casting a full length slab of 150-160" would take about fifty minutes.

You must be logged in to leave a comment